1 mi along federal highway for 29-acre coverage in Estado de Mexico, MEX.
Survey made for reviewing utility pole status and cable continuity. With our state-of-the-art drone we were able to deliver an Orthomosaic with incredible resolution so utility poles and cables were visible in the image. We also delivered contours with 1’ accuracy and necesary information for permit submission.
10 mi state route survey for 260 Acre coverage.
Survey made for engineering a subsurface fiber optic installation along the State Route. The full length of the project was covered in less than 3 days, delivering information necessary for permit submission too. We delivered an Orthomosaic with less than 2” deviation. Exceeding expectations from the client who required 3’ maximum deviation.
11.3 Mile state route survey for 292 Acre coverage across “Sierra Gorda” Mountain Range
Survey made for engineering a subsurface fiber optic installation along the State Route.
The QRO 100 State Route crosses the “Sierra Gorda” Mountain Range, making it a difficult route to survey in traditional ways. We surveyed the length of the project in 3 Days. Acquiring the required information for the client and permit submission shortening the delivery time and getting precise information necessary for the permit approval. We delivered information with less than 3” deviation, exceeding expectation from the client that required 3’ maximum deviation.
+950 Projects
Row Alignmet Sheets +30 Projects
Plans for permitting +270 exhibits
Gas Routes +4000 Tracts
+59,000 FTTx District Projects Nationwide
+7,000 Network Rehabilitation Districts
+5,000 Cellular base station Projects
– Federal, State and Municipal Permits
– Telecommunications Hardware Engineering
– Network Rehabilitation
– FTTx Projects
– Cell Sites
– Fiber Optic Engineering
– Broadband Planning
– Plant Inventory
– Access Roads
– Property Acquisition
+59,000 FTTx District Projects Nationwide
+7,000 Network Rehabilitation Districts
+5,000 Cellular base station Projects
– Federal, State and Municipal Permits
– Telecommunications Hardware Engineering
– Network Rehabilitation
– FTTx Projects
– Cell Sites
– Fiber Optic Engineering
– Broadband Planning
– Plant Inventory
– Access Roads
– Property Acquisition
Permits acquisition for the Estrella project, for the use of right of way before federal, state, municipal, parastatal and private infrastructure, for the installation of the telecommunications network.
2,641 miles
2,500 approx. permits processed
Right-of-Way permit acquisition with federal, state, and local authorities for the installation of fiber optics telecommunications network.
8,389 miles
Drawing of 5,230 blueprints for permit acquisition in 2019 for a new nationwide network.
Feasibility Study for the release of rights of way in the State of Michoacán, in 2 routes of 7.5 and 10 miles respectively.
Feasibility study for the release of rights of way of 3 alternative routes in the states of Guanajuato, Jalisco and Aguascalientes, with an average length of 124 miles each.
Arizona Public Services Project
(1st, 2nd & 3rd phase)
Permits acquisition for the steam generators transportation for the nuclear power plant in Palo Verde Arizona, on the Mexican Stretch before Federal, State and Municipal, and private Enterprises entities.
From “Encanto” Beach in Puerto Peñasco to Sonoyta, Sonora.
Negotiation and Acquisition of Right of Way for the Gas Pipeline Construction Cd. Pemex – Valladolid – Mérida.
466 miles